Imprint
Legal notes

   
 
Projects


Tunnelling

Single Buildings

Landslides & Rockfalls

Skiing Areas

Road Construction

Railway Construction

Hydrogeology (Draw Down)

Tunnelling

Period Project Task Location
Since 2010 Highspeed Railway Line
Bejing - Wuhan (PDL)
Foreign Quality Representative (Tunnel Expert) for the Shijiazhuang City Tunnel (C&C, mining technology) Shijiazhouang, Hebei Province, PR China
Since 2010 Highspeed Railway Line
Hefei - Fuzhou (DPL HeFu), Mingan Section
Supervision, Supervision management Dawu, Hubei Province, PR China
2010 Finnetunnel (ICE high-speed railway line Erfurt - Leipzig/Halle) Geological-geotechnical consultung and assistance for ARGE (consortium) Finnetunnel during the building of cross-cuts Herrengosserstedt (Sachsen-Anhalt), Germany
2009 - 2010 Bangalore Metro Rail Project
North South Corridor
Geological-geotechnical and hydrogeological consulting (tendering and planning), geological interpretative report, dewatering conception for excavations and ramp areas Bangalore, India
2007 - 2009 Alte Mainzer Tunnel Geological, hydrogeological and geotechnical supervision Mainz, Germany
Since 2008 Tunnel Sucharski Geological, geotechnical and hydrogeological consulting concerning several aspects of using TBM Gdansk, Poland
2007 - 2008 Tunnel Eisgrub Geological, geotechnical, environmental and water management-related investigation and report Frauenberg near Landshut, Germany
Since 2006 Subway Köln, 2. construction section Geological-geotechnical investigation, planning and report Köln, Germany
2006 - 2007 Extension Arlbergtunnel Geological consulting for excavatability, abrasion prediction Arlberg, Austria
2006 - 2007 Subway Köln, 1. construction section

Geological-geotechnical supervision shield tunnelling northern section

Köln, Germany
2006 Tunnel Münster Wiesing Abrasion prediction, supply management, planning of water management for escape shafts and cross cuts Railway line Brenner, access railway Nord, Austria
2004 - 2005 Tunnel Siegkreisel Betzdorf Engineering geological documentation, amendment consulting Betzdorf, Germany
2004 Alter Loreley/Alter Rosssteintunnel Engineering geological documentation, amendment consulting St. Goarshausen, Germany
2003 - 2008 Tunnel Vomp-Terfens (H5/H5V) Engineering geological documentation, geological, geotechnical and hydrogeological consulting Railway line track Brenner, access railroad North, Vomp, Austria
2003 - 2006 Open excavation Terfens (H6) Engineering geological documentation, geological, geotechnical and hydrogeological consulting Railway axis Brenner, access railway Nord, Vomp, Austria
2003 - 2006 Tunnel Augustaburg Engineering geological documentation, geological, geotechnical consulting NBS Ebensfeld - Erfurth, Erfurth, Germany
2003 Tinastollen Geological-geotechnical consulting and project management Aßling, Germany
2002 - 2003

Subway Dortmund,
contract section 10.1

Engineering geological documentation, geological, geotechnical consulting Dortmund, Germany
2002 - 2003 Birgltunnel Engineering geological, geotechnical and hydrogeological consulting, amendment consulting Tauern axis Abschnitt Brandstatt – Loifarn, Schwarzach/St. Veit, Austria
2002 - 2003

Kenlachtunnel

Engineering geological, geotechnical and hydrogeological consulting, amendment consulting Tauern axis Abschnitt Brandstatt – Loifarn, Schwarzach/St. Veit, Austria
2001 - 2004 Subwayline U3 Northern section 1 Water management survey, supporting the geotechnical sitemanagement München, Germany
2001 - 2002

Cut and Cover Tunnel Geisberg

Documentation of exploration wells, dimensioning of borepiles, geotechnical consulting NBS Nürnberg-Ingolstadt, Hepberg, Germany
2001 - 2002 Exploration tunnel Fiecht Engineering geological, geotechnical and hydrogeological consulting; amendment consulting Railway line Brenner, access railway North, Schwaz, Austria
2000 - 2003 Channel Conversion
Mittlerer Ring Ost
Geotechnical site management, planning and documentation; risk evaluation; amendment consulting München, Germany
2000 - 2002 Tunnel Audi Nord Geotechnical and hydrogeological consulting, engineering geological documentation, amendment consulting NBS Nürnberg-Ingolstadt, Ingolstadt, Germany
2000 - 2001 Stubnerkogel-Tunnel Consulting concerning variation of alignments and structure-borne noise issues Badgastein, Austria
1999 - 2001 Tunnel Geisberg Generall consulting, Engineering geological documentation, amendment consulting NBS Nürnberg - Ingolstadt, Hepberg, Germany
1999 Tunnel Himmelberg General consulting, Engineering geological documentation, amendment consulting NBS Köln-Rhein/Main, Montabaur, Germany
1999 Tunnel Wahnscheid General consulting, Engineering geological documentation, amendment consulting NBS Köln-Rhein/Main, Montabaur, Germany
1999 Tunnel Schulwald General consulting, Engineering geological documentation, amendment consulting NBS Köln-Rhein/Main, Wiesbaden, Germany

Top

Single Buildings

Period Project Task Location
2010 New construction of FBZ (Skill Centre) Metallinnung München Geological-geotechnical investigation, planning and consulting Garching near München, Germany
2010 Water supply for the recreational area Brauneck Geological-geotechnical expertise on feasibility Lenggries, Germany
2009

Railway bridge Höhenkirchen-Siegertsbrunn

Geological-geotechnical investigation, planning and consulting Gemeinde Höhenkirchen-Siegertsbrunn, Germany
2009 Bridge Kunduz, Afghanistan Geological-geotechnical planning and consulting Afghanistan
2009 St 2047, bridge across river Amper, Dachau Geological-geotechnical investigation, planning and consulting Dachau, Germany
2008 B16 road-bridge across river Donau, Günzburg Geological-geotechnical investigation, planning and site supervision B16 near Günzburg, Germany
2008 Revolution-Bridge Geological-geotechnical investigation, consulting, planning, consulting, site supervision, stability-calculations and foundation soil inspection and approval Haag an der Amper, Germany
2008 Arnbach-Bridge Geological-geotechnical investigation, planning and consulting Arnbach near Schwabhausen, Germany
2008 Reconstruction Freisinger Straße Geological-geotechnical and hydrogeological investigation, planning and consulting Dachau, Germany
Since 2008 EXPO 2010, German Pavillion Investigation of construction soil, geological-geotechnical consulting, foundation-consulting Shanghai, PR China
2007 Expansion of cemetery of Argelsried Foundation soil investigation, consulting for water management Gilching, Germany
2006 - 2007 Industrial plant Yanbu III Foundation consulting Yanbu, Saudi Arabia
2006 - 2007 Industrial plant Jubail Foundation consulting Jubail, Saudi Arabia
2006 Bridge near Winden Foundation soil investigation, hydrogeological investigation, foundation consulting Winden am Aigen, Markt Reichertshofen, Germany
2006 New building tower block Süddeutscher Verlag Geological-geotechnical approval of
foundation soil
München, Germany
2006 New railway bridge PAF-17 New building of a road bridge across an existing railway track Foundation soil investigation, hydrogeological investigation, foundation consulting Irsching (Lkr. Pfaffenhofen), Germany
2006 Rail triangle Pasing Foundation soil investigation, hydrogeological investigation, foundation consulting München, Germany
2005 Cement plant Rohrdorf Geotechnical investigation, foundation consulting and supervision Rohrdorf, Germany
2005 - 2007 Brenner Basistunnel, planning of dumpsite Nordtirol Geological-geotechnical and water management-related investigation and planning Northern Tyrolia, Austria
2002 - 2005 Subwayline U6
northern section 7
Geotechnical site supervision, geological and geotechnical consulting Garching near München, Germany

Top

Landslides & Rockfalls

Period Project Task Location
2008 - 2009 Rockfall hazard Karlstein - risk evaluation Geological-geomechanical investigation, geological mapping, detailed measuring of joints and faults, stability calculations, evaluation of potential hazards Bad Reichenhall, Germany
2008 Treppenweg Pullach II Geological documentation, monitoring of mass movements, stability calculations, risk analysis, restoration supervision Pullach im Isartal, Germany
2004 - 2005

Treppenweg Pullach

Geological documentation, monitoring of mass movements, risk analysis, restoration supervision Pullach im Isartal, Germany
2003 Catchrisk,
Phase I
Development of a system to determine/evaluate probabilities and intensities of stone-chipping and rockfalls -
2002 - 2003 Hotel Bayern Report and consulting concerning risk-potential deriving from mass movements and influences from nearby brook "Sengerschloßbach"  Tegernsee, Germany
2001 Postkeller pathway Report on rockfall-risks and riskmanagement Riedenburg, Germany
1998 - 2001 Rockfall hazard Hotel Wetzlgut - risk evaluation Report on geological and hydrogeological conditions, mass movements and groundwater balance; special counsel for legal proceedings concerning water law Badgastein, Austria
1998 Rockfall Fischbachtal Report about causes of rockfall Ruhpolding, Germany
1997 Rockfall hazard Trier - risk evaluation Investigation and risk evaluation Trier, Germany

Top

Skiing Areas

Period Project Task Location
Since 2008

Cableway Winklmoosalmbahn -
Steinplatte

Geological-geotechnical investigation, planning, consulting and site supervision Seegatterl/Reit im Winkel, Germany
Since 2008

Snowmaking-facilities
Jennerbahn

Geological-geotechnical investigation, planning, and site supervision Königssee, Germany
Since 2008 Expansion of skiing-region Wendelstein, snowmaking-facilities Geological-geotechnical investigation, planning, and site supervision Bayrischzell, Germany
Since 2008 Expansion of skiing-region Taubenstein  Geological-geotechnical investigation, planning and site supervision Spitzingsee, Germany
2007 Snowmaking-facilities of skiing-region Jennertal Geological-geotechnical investigation, planning and site supervision Königssee, Germany
Since 2006 Cableway Osthangbahn -
Replacement of a quad-seater chairlift
Geological-geotechnical investigation, planning, site supervision Spitzingsee, Germany
Since 2006 Snowmaking-facilities
Brauneck
Geological-geotechnical investigation, planning, site supervision Lenggries, Germany
Since 2006 Snowmaking-facilities
Stümpfling/ Sutten
Geological-geotechnical investigation, planning and site supervision Spitzingsee, Germany
2004 - 2005 Cableway Suttenbahn Geotechnical evaluation of locations for towers, terminals and reservoirs Spitzingsee, Germany
2004 Cableway Stümpflingbahn Geotechnical evaluation of locations for towers and terminals Spitzingsee, Germany

Top

Road Construction

Period Project Task Location
2009 Resting area Rohrbach Geological-geotechnical investigation, planning and consulting A9, Nürnberg-München, Germany
Since 2009 Federal Highway B15neu, Section Neufahrn - Ergoldsbach Geological-geotechnical investigation, planning and consulting Ergoldsbach in Niederbayern, Germany
2008

Federal Highway B15neu, Section Saalhaupt - Neufahrn

Geological-geotechnical and hydrogeological investigation, planning and consulting Neufahrn in Niederbayern, Germany
Since 2008 Motorway Nadlac-Sibiu Geological-geotechnical investigation and boring supervision on behalf of DIWI Consult International GmbH Romania
2008 - 2009 Motorway A8 Ost Vogling - östl. Neukirchen Geological-geotechnical investigation, planning and consulting Neukirchen in Oberbayern, Germany
2007 Public-private partnership BAB 5 Foundation consulting, water management Malsch-Offenburg, Germany
2006 Bridge across the Nyabarongo River Geological-geotechnical investigation, planning and consulting, foundation consulting, subsidence-, soil failure- and Slope stability-calculations Rwanda, Africa
2006 Public-Private partnership BAB 8 Foundation consulting, water management München - Augsburg, Germany

Top

Railway Construction

Period Project Task Location
Since 2010 Highspeed Railway Line
Hangzhou - Kunming (PDL HuKun), Section 2
Foreign expert supervision, instruction and training, inspections Yichun, Jiangxi Province, PR China
2010 New Railway Beijing - Wuhan - Guangzhou - Hongkong Instruction and training, supervision Guangzhou, PR China
Since 2007 "Ringschluss Erding", Package C Geological-, environmental-geotechnical and water management-related investigation and planning Erding, Germany
Since 2007

"Ringschluss Erding", Package B

Geological-, environmental-geotechnical and water management-related investigation and planning Erding, Germany
Since 2007 New Railway Line Kalambaka-Kozani; Dimitra-Siatista Geological-geotechnical investigation, planning and geotechnical reports Central Greece
Since 2007 High-speed railway line Wenzhou - Fuzhou Geological-geotechnical supervision Ningde, VR China
Since 2006 Metropolitan railway Köln,
2. construction section
Geological-geotechnical investigation, planning and report Köln, Germany
2007 Delhi Metro Geotechnical Interpretative Report New Delhi, India
2007 - 2008 Renovation of a railway line (bridge construction) over a flood retention basin (HRB) Goldbergsee Geological-geotechnical planning and consulting, foundation soil approval Coburg, Germany
2006 - 2007 Metropolitan railway Köln,
1. construction section
Geological-geotechnical supervision, Schildfahrt Nord Köln, Germany
2006 - 2007 New Nanjing Dashengguan Yangtze Bridge Geological-geotechnical supervision and consulting Nanjing, PR China
Since 2006 High speed railway line
Guangzhou - Wuhan
Geological-geotechnical supervision and consulting Guangzhou - Wuhan, PR China
2006 - 2007

High speed railway line
Jing - Jin

Geological-geotechnical supervision and Consulting Tianjin, PR China
2006 High speed railway line
Hefei - Nanjing
Geological-geotechnical supervision Hefei, PR China
2003 - 2008

Magnetic levitation train München

Geological-geotechnical and water management planning Planning section 3, Airport Munich (MUC), Germany
2002 - 2005 Subwayline U6
northern section 7
Geotechnical site supervision, geological and geotechnical consulting  Garching bei München, Germany

Top

Hydrogeology (Draw Down)

Period Project Task Location
2001 to 2004 Middle Marsyangdi hydro-electric project Engineering-geological and geotechnical consulting Nepal
2000 Middle Marsyangdi hydro-electric project Field investigation; submission consulting  Nepal

Top

Last update: 02/21/2011
 
Home